Circuit board replacement – Hydrotech 6200 SXT Automatic Meter Initiated Water Softener User Manual
Page 36

35
After Servicing
1. Reconnect brine tube and drain line.
2. Return bypass or inlet valve to normal in service position. Water Pressure will automatically build in the softener.
NOTE: Be sure to shut off any bypass line.
3. Check for leaks at all sealed areas. Check Drain seal with the control in the backwash position.
4. Plug electrical cord into outlet.
5. Set Time of Day and cycle the control valve manually to assure proper function. Make sure control valve is returned to
the In Service position.
6. Verify the salt level in the brine tank is sufficient. Start regeneration cycle manually if water is hard.
Circuit Board Replacement
1. Detach the circuit board from valve
front cover by removing two screws.
2. Disconnect the meter cable and
power head harness from the
circuit board.
3. Replace and connect the new
circuit board on the front cover.
Screws
Meter Cable
Power Harness