English, 7 electric board installation – CAME Gard 8 230v A.C User Manual

Page 11

Advertising
background image

11

T

h

e d

at

a a

n

d i

n

fo

rm

at

io

n p

rovi

d

ed

i

n

t

h

is

m

an

u

al

a

re to b

e c

o

n

si

d

er

ed

s

u

sc

ep

ti

b

le to c

h

an

g

e a

t a

n

y t

im

e w

it

h

o

u

t w

ar

n

in

g

, by CAM

E c

an

ce

ll

i a

u

to

m

at

ic

i S

.p

.A

.

ENGLISH

—

—

:,

- Release the gearmotor and
manually turn the spring to
increase or decrease traction until
the bar rests at 45°.

- Tighten the blocking nut and refasten the gearmotor.

Note: make sure the spring functions properly:

- the spring is loose when the bar is in the vertical position (at rest)

- the spring is tight when the bar is in the horizontal position (tense).

5.7 Electric board installation

- Loosen the three screws in the container cover located in the
upper part of the unit.

- Insert the board in the container and fasten it with the screws

provided; carry out all the electrical connections (see the dedicated

technical documentation enclosed with the board).

Advertising
This manual is related to the following products: