5 installation, English, 4 size measurements – CAME Gard 8 230v A.C User Manual

Page 4: 1 preliminary checks 5.2 tools and materials

Advertising
background image

4

T

h

e d

at

a a

n

d i

n

fo

rm

at

io

n p

rovi

d

ed

i

n

t

h

is

m

an

u

al

a

re to b

e c

o

n

si

d

er

ed

s

u

sc

ep

ti

b

le to c

h

an

g

e a

t a

n

y t

im

e w

it

h

o

u

t w

ar

n

in

g

, by CAM

E c

an

ce

ll

i a

u

to

m

at

ic

i S

.p

.A

.

ENGLISH













MAX



4.4 Size measurements

Before proceeding with the installation, it is necessary to:

• Make sure the area selected for the mounting of the base and for the unit itself presents no hazards;

• Provide for suitable omnipolar disconnection device with more than 3 mm between contacts to section power supply.

• Connections inside the case made for protection circuit continuity are allowed as long as they include additional insulation
with respect to other internal drive parts.

• Install suitable tubes and ducts for electric cable passage to guarantee protection against mechanical damage.

Installation must be carried out by expert qualified personnel and in full observance of regulations in force.

5 Installation

5.1 Preliminary checks

5.2 Tools and materials

Make sure all tools and materials necessary are within reach to install the edge in maximum safety, according to regulations in
force. The following figure illustrates the minimum equipment for the installer.

Measurements in mm

Advertising
This manual is related to the following products: