English, 5 installation of the unit – CAME Gard 8 230v A.C User Manual

Page 7

Advertising
background image

7

T

h

e d

at

a a

n

d i

n

fo

rm

at

io

n p

rovi

d

ed

i

n

t

h

is

m

an

u

al

a

re to b

e c

o

n

si

d

er

ed

s

u

sc

ep

ti

b

le to c

h

an

g

e a

t a

n

y t

im

e w

it

h

o

u

t w

ar

n

in

g

, by CAM

E c

an

ce

ll

i a

u

to

m

at

ic

i S

.p

.A

.

ENGLISH

- Open the door with the
proper key, remove the
top dome and take out the
inspection door.

DX









5

6

7

&# &! &

SX

- Should installation on the right be
required, the direction of the bar’s
opening must be inverted. Proceed
in the following manner:

- remove the spring securing
bracket and the transmission rod
from the lever arm;
- loosen the motor support grub
screw;
- rotate the lever arm by 90°;

- Fix the spring securing bracket
and the transmission rod on the
side opposite that of lever arm;
- tighten the grub screw;
- invert the motor’s U-V phases and
the FA and FC endstop wires on the
control panel terminal;

5.5 Installation of the Unit

- The barrier is designed to be installed on the left of the gateway as seen from inside.

Lever arm

Transmission
rod

Spring securing bracket

Grub

Advertising
This manual is related to the following products: