6 verification kit, Advanced operations – Hach-Lange DR 5000 User Manual User Manual

Page 117

Advertising
background image

117

Advanced Operations

5. The Drift Check runs 1 hour.

This test takes a reading every minute for one hour. Every
15 minutes, linear regression is used to calculate the slope
(rate of change) for the previous 15 minute interval.

6. The last reading and slope for each 15 minute interval are

displayed. At the end of the hour, the overall values are
calculated and displayed. The test proceeds to completion.

7. Press Cancel to return to Optical Checks.

6.8.3.6 Verification kit

The Verification Kit (see

Section 9 on page 133

) is designed for

periodic monitoring of scattered light, photometric accuracy and the
wavelength accuracy of the spectrophotometers.

When results exceed allowable tolerances (given in the quality
control certificate to the test record), contact the manufacturer.

1. Press Verification Kit in the Optical Checks menu.

2. Press Nominal Values.

Advertising