In-line installation – King Technology POOL FROG XL PRO User Manual

Page 14

Advertising
background image

14

PVC

CEMENT

Water

CYCLER

MeteredPoo

l Purifier

In-line Installation

Do NOT install
POOL FROG
XL PRO® off-line.

Following Primer directions, brush Primer on the inside
of the male adapters and to ends of pipe. Repeat this
process with PVC cement following directions on that
product.

Measure the distance between
outside male adapters and cut
out a section of pipe 3” less
than that dimension.

Allow a minimum of 12” above and on each
side of POOL FROG XL PRO® to ensure room
for easy replacement of POOL FROG® Mineral
Reservoir and POOL FROG® Pac.

Insert PVC pipe into male
adapters with a twisting action.
Hold in place 5 to 10 seconds
to bond.

TOOLS NEEDED

Hacksaw

MATERIALS NEEDED

Tape Measure

Primer and PVC Cement

RECOMMENDED

Corrosion Resistant
Check Valve

#10 x 1 1/4” Phillips
Pan Head Screws with
Washers

Use Phillips pan head
screws through the
mounting holes at the
POOL FROG® Cycler
bases to secure the
POOL FROG XL PRO®
into a treated wood
base.

Isolating the POOL FROG XL PRO® by installing a
corrosion resistant check valve is recommended.

1.

3.

4.

Pipe Wrench

Bi-flow valve design
allows water flow in
either direction.

®

BR

AN

D

PAC 540C

®

B

R

AN

D

2.

Do NOT install in copper pipe
if using POOL FROG® Pac as
chemical corrosion occurs.

Install after all equipment and

as far as possible from heater.

Any additional sanitizing

equipment that is installed
with FROG® must be installed
after FROG® (never before)
on the return line to the pool.

Advertising