Preinstallation requirements, Selecting a site, Checking the package contents – Acer Altos R300 User Manual

Page 34

Advertising
background image

2 System tour

20

Preinstallation requirements

Selecting a site

Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:

Near a grounded power outlet

Clean and dust-free

Sturdy surface free from vibration

Well-ventilated and away from sources of heat

Secluded from electromagnetic fields produced by electrical
devices such as air conditioners, radio and TV transmitters, etc.

Checking the package contents

Check the following items from the package:

Altos R300 system

Altos R300 User’s guide

Acer EasyBUILD

TM

Altos R300 accessory box

If any of the above items are damaged or missing, contact your dealer
immediately.

Save the boxes and packing materials for future use.

aa r300.book Page 20 Tuesday, March 11, 2003 9:42 AM

Advertising