Operating procedures, Inspection and maintenance of unit – Magnum Venus Plastech PATRIOT 1-1_4 PAT-LS-12270 User Manual

Page 29

Advertising
background image

PAT-LS-12270 Series Fluid Section Manual

Rev. 01/2012

Page | 29

Operating Procedures:



INSPECTION AND MAINTENANCE OF UNIT

1) Check solvent cup to be sure it is 1/2 full with oil (PAT-LS-OIL).
2) Check catalyst and material levels.
3) Inspect material spray tip and o-ring. Replace if necessary.
4) Inspect catalyst tip assembly and o-rings. Replace if necessary. (ATC Gun)
5) Inspect tip pin o-rings on front of gun head and replace if nicked or worn. (ATC Gun)
6) Assemble catalyst tip and material tip onto gun. (ATC Gun)
7) Lubricate threads on retaining ring and assembly onto gun. (ATC Gun)
8) Inspect hose assemblies and connections for leaks and wear and tear. Replace if

necessary. Do not wait until hose is so worn that it may burst.

9) Check roving quantity (if applicable).
10) Inspect and replace if necessary: (if applicable)

a) Chopper Blades
b) Anvil Sleeve
c) Cutter Head Bearing
d) Idler Bearing

11) Inspect and adjust if necessary: (if applicable)

a) Cutter head to Anvil Sleeve tension
b) Idler Bearing to Anvil Sleeve tension
c) Check Chopper position for most efficient disbursement of chop into spray

pattern.

12) Oil Cutter assembly Air Motor with Magnum Air Motor Oil as necessary (normally

2 – 3 drops daily, depending on usage).

Advertising