First operation 2 first operation – Minuteman E 26 (7061.11) User Manual

Page 12

Advertising
background image

10

First Operation

2

First Operation

2.1

Instruction

Only persons trained by qualified Minu-
teman technicians are authorized to
operate, service and repair the machi-
ne. Operators must read and under-
stand this manual before operating or
maintaining this machine.

2.2

Initial charging procedure

Before first operation of the
machine, fully charge the bat-
tery with an initial charging pro-
cedure and comply with the
operating instructions of the
charger as well as with those of
the battery manufacturer. Mi-
nuteman cannot be held liable
for damages resulting from an
insufficient initial charge.

2.3

Before Putting into Operation

Complete the following inspections be-
fore taking the machine into operation:
1. Check the area around the machine

for signs of leakage. Hoses, lines
and tanks must be free from any lea-
kage or damage.

2. Install brushes and squeegee, see

maintenance chapter.

3. Install batteries and connect battery

plug, see maintenance chapter.

4. Check battery charge and recharge

if required. An initial charge is requi-
red before first operation of the ma-
chine.

5. Empty recovery tank and clean it if

required, see maintenance chapter.

6. Refill solution tank and add cleaning

agent according to the manufactur-
er's recommendations.

Use only cleaning agents sui-
table for automatic machines
(low-foaming) and comply with
the instructions for use, dispo-
sal and with the warning infor-
mation specified by the cle-
aning agent's manufacturer.

2.4

Start Machine

Proceed with the following to set the
machine to operating mode:
• Disconnect mains plug of the char-

ger from outlet and fasten to holder.

• Switch on machine by actuation of

key switch from position (0) to positi-
on (1).

Advertising