Installation details-automatic powerstop, Powerstop overview – Poweramp POWERSTOP SERIES User Manual

Page 12

Advertising
background image

10

4111-0014 — July 2013

INSTALLATION DETAILS-AUTOMATIC POWERSTOP

IO ST

-A 11/06

LEVEL

11”

SECTION "A-A"

A

A

7

12

8

9

14

14

6

5

4

1

3

11

10

CONNECT TO BASE END OF RELEASE CYL.

BC

DESCRIPTION

NOTE

RC

CONNECT TO ROD END OF RELEASE CYL.

Capacitor Wiring Detail

M

ot

or

Bl

ue

M

ot

or

Re

d

6

2

13

R.V. SET @

HYDRAULIC SCHEMATIC

105

M

650 PSI

RC

BC

1

1

1431-0011

Connector - 2-Screw

3/8

2

3

1431-0086

Insulated Terminial

16-14 AWG

3

2

2101-0017

Hex Head Capscrew

3/8-16 UNC X 1

4

2

2101-0140

Lock Washer

3/8

5

1

2751-0016

Cover - J-Box

4 X 4

6

1

3051-0058

Capacitor - Motor Start

64-77mF - 330V

7

2

6431-0001

Grommet

1-3/8 OD X 3/4 ID

8

2

9301-0164

Fitting Conn Str Thrd

#4 ORB X #4 JIC

9

1

9391-0009

Powerpac - PowerStop

1PH - 115V - 1/4 HP - 1 GPM

10

1

9392-0045

Cover - PowerStop

B CAD

11

1

9393-0025

Powerpac Mounting Weldment

B CAD

12

2

9904-0097

Hyd Hose Assy - 1/4"100R1 X 24.00

#4 JICF SWIVEL BOTH ENDS

13

1

R513-0050

Wire

16 GA RED X 5.00"

14

2

R598-0090

Split Flex Conduit

1/4" X 9.00"

BILL OF MATERIAL

QTY

ITEM

DESCRIPTION

PART NO.

SIZE

STOP-TITE Overview

STOP-TITE Powerpack

Powerpack

Location Options

For comprehensive installation

instructions of the Automatic

STOP-TITE (STOP-TITE ) read and

understand the Installation

and Operation Manual.

AAL

McGuire.

McGuire

STOP-TITE

STOP-TITE

Coordinate powerpack location and hose
length for proper placement.

Dock Face
Appropriate location when the likelihood of
flooding, snow removal and damage from
trailer/trucks is minimal.

Under The Dock Leveler
When under the dock location is used, make
certain to locate the powerpack where leveler
will not interfere in below dock conditions.
The routing of hydraulic and electrical lines
from the powerpack to the restraint are
best placed through min. 3” PVC (hydraulic)
and 3/4” conduit (electricl) chase during pit
construction.

Inside Building
Locate powerpck to minimize obstruction
potential. Hydraulic and electrical lines
from the Powerpack to the restraint are best
placed through min. 3” PVC (hydraulic) and
3/4” (electrical) chase during pit construction.

AAL

Conduit, flexible or rigid, must be connected between the limit switch on the restraint and the powerpack. Wiring to and
from the restraint must be limited to restraint wires only. Do not run high voltage lines through the same conduit as restraint
wires. Conduit and associated hardware to complete wiring and mounting of powerpack are to be supplied by others.

POWERSTOP Overview

POWERSTOP Overview

Poweramp

Advertising