Function check, Rpa-2 powder applicator - installation – Ransburg RPA-2 Powder Applicator A12950-XXX User Manual

Page 16

Advertising
background image

RPA-2 POWDER APPLICATOR - Installation

13

LN-9271-12.2

Function Check

1. Switch on the high voltage controls. A good set-

ting to start is 20 kV for doing checks

2. Adjust the high voltage at the control unit.

3. Slowly increase the high voltage. The value of

the high voltage display should increase slowly.

4. The maximum nominal output current can be

monitored on the applicator control unit.

Alignment Marks

Alignment Marks

5. Verify the presence of the high voltage field by

means of a high voltage probe.

6. Shaping air, electrode rinsing air, cascade rins-

ing air and dilution air (if available) are adjusted
depending on the application (see “Start-Up” in
the “Operation” section).

7. If all tests have been completed positively, the

applicator is ready for operation. If malfunctions
happen, the error cause can be determined by
means of the list in the ‘Troubleshooting Guide”
in the maintenance section.

Advertising