Securitron CEPT User Manual

Page 3

Advertising
background image

PN# 500-22115

Page 3

Rev. C, 05/11

Electrical
The following chart shows the electrical specifications for each CEPT model.

MODEL

TYPE

WIRE SIZE/QTY

CURRENT LIMIT (Per Wire)

18 AWG/2

Max. 5A

CEPT-10

10 Wire (2+8)

22 AWG/8

Max. 1A

EL-CEPT

ElectroLynx® (8+4)

22 AWG/12

Max. 1A

24 AWG/8

Max. 1A

CEPT-C5E

CAT 5e (8+1)

22 AWG/1

Ground (Max. 1A)


INSTALLATION INSTRUCTIONS
NOTE: The CEPT should always be mounted above the second hinge from the floor.
The CEPT was designed primarily to be installed into a factory prepped door and frame.
However, the unit can be installed into an un-prepped door and frame by following the specific
instructions provided on the product installation diagram. The following exploded illustration
shows the included hardware required to properly install a CEPT to a factory prepped door
opening (CEPT-10 shown).

To install the CEPT to a factory prepped door and frame:

 Route/pull utility wires/cable through the prepped holes in door and frame.

 Pop out the desired knock-out hole in the back box.

Notes:

1. Back boxes are normally required to meet fire code requirements.
2. The 7/8” diameter knock-out holes in the back boxes are provided for EMT type

electrical conduit fittings.

3. The 5/8” diameter knock-out holes are for use of the provided strain relief bushings.

 To install the strain relief bushing, lay the utility cable (not included) into the slotted

opening in the bushing allowing a sufficient wire length (loop) for making connections.

Fold the hinged retainer over the cable, squeeze together using pliers and then insert
through the 5/8” [15.9mm] knock-out in the back box.

(Prepped) Door

(Prepped) Frame

Back Box(es)

CEPT

Advertising