Superwinch H14P – 6,350 kgs Manual Clutch (Long Drum) User Manual

Page 9

Advertising
background image

ROPE INSTALLATION

The rope must be of good quality, have a steel core and meet the following specification :

1. Unwind the rope by rolling it out along the ground with the tapered end nearest to the winch. NEVER wind the rope
straight onto the drum from a coil.

2. Dis-engage the Freespool.

3. Insert the tapered end of the rope into the cross-hole in the end of the drum and secure by tightening the setscrew.

4. Re-engage the Freespool.

5. Carefully run the winch in the "Winch In" direction. Keeping tension on the rope spool 5 or 6 wraps of rope neatly

onto the drum.

6. Apply moderate tension (approx. 700 kg to the rope. Carefully run the winch in the "Winch In" direction. Ensure the

layers are neatly wrapped onto the drum. This will minimize damage to the lower layers of rope when a load is applied.

PULLING OUT THE ROPE

Disengage the Freespool. With a pair of gloves on, pull out the rope and secure to anchor or load, check that there are
at least 5 turns left on the Drum. Re-engage the Freespool.

Model Designation .................................................. H10P

H12P

H14P

Part No .................................................................... 5310, 5310S

5320, 5320S

5330, 5330S

............... 5311, 5311S

5321, 5321S

5331, 5331S

......... 5312, 5312S

5322, 5322S

5332, 5332S

.... 5313, 5313S

5323, 5323S

5333, 5333S

Model Designation .................................................. H14P
Part No .................................................................... 653001

Minimum Breaking Load ......................................... 84.4 kN

100.0 kN

118.0 kN

Tensile Grade ......................................................... 1960 N/mm

2

1960 N/mm

2

1960 N/mm

2

Diameter .........................................................

11 mm

12 mm

13 mm

ROPE INSTALLATION

05

05-1

ROPE INSTALLATION

Advertising