Preliminary procedure, Adjust lf accuracy – Teledyne LeCroy CP150 User Manual

Page 18

Advertising
background image

CP150 Current Probe

12

922175-00 Rev A

Description

Minimum Requirements

Test Equipment Examples

Patch Cables (4 required)

Male Banana to Male Banana, 12"

Pomona B-12-0 (black) or

Pomona B-12-2 (red)

BNC Adapter

BNC Male to Dual Banana Jack

Pomona 1296

Preliminary Procedure

1. Remove the probe compensation box circuit board by removing the two screws from the cable

end of the compensation box and sliding the circuit board out of the box.

2. Connect the CP150 compensation board to the channel 1 input of the oscilloscope through the

ProBUS extension cable, and completely close the probe slider.

3. Turn the oscilloscope on and allow at least 30 minutes warmup time for the CP150 and test

equipment before performing the Verification Procedure.

Adjust LF Accuracy

Figure 2. LF accuracy adjustment set up.

Advertising