Ct-7000 operating instructions – Vanguard CT-7000 User Manual
Page 58
Advertising

CT-7000 Operating Instructions
51
9.14 Print a Breaker Test Plan
The user can print a breaker test plan stored in the CT-7000 EEPROM.
Table 18.0 Print a Test Plan
STEP
OPERATION
ACTION
DISPLAY
1
SELECT SET UP MENU.
PRESS # 3 KEY.
1. ANALYSIS POINT
2. MEASUREMENT UNITS
3. SAVE / RESTORE
4. NEXT PAGE
2
SELECT ANALYSIS POINT.
PRESS # 1 KEY.
1. OPEN TIMING
2. CLOSE TIMING
3. PRINT SETTING
4. TEST PLAN
3
SELECT TEST PLAN.
PRESS # 4 KEY.
1. LOAD TEST PLAN
2. PRINT TEST PLAN
3. PRINT DIRECTORY
4
SELECT PRINT TEST PLAN.
PRESS # 2 KEY.
LOAD TEST PLAN
“∧” “∨” TO SCROLL
"ENTER" TO SELECT
5
VIEW TEST PLAN HEADER.
PRESS “UP” or
“DOWN” KEY TO
SCROLL.
DISPLAY TEST PLAN HEADER
6
CONFIRM TEST PLAN TO BE
PRINTED.
PRESS THE "ENTER"
KEY.
1.TIME BRKR
2.GET RSLT
3.SET UP
4.DIAGNOSTICS