9.15 Print a Breaker Test Plan Directory
The CT-7000 breaker test plan directory stored in the CT-7000 EEPROM using the steps in
table below:
Table 19.0 Print a Breaker Test Plan Directory
STEP
OPERATION
ACTION
DISPLAY
1
SELECT SET UP MENU.
PRESS # 3 KEY.
1. ANALYSIS POINT
2. MEASUREMENT UNITS
3. SAVE / RESTORE
4. NEXT PAGE
2
SELECT ANALYSIS POINT.
PRESS # 1 KEY.
1. OPEN TIMING
2. CLOSE TIMING
3. PRINT SETTING
4. TEST PLAN
3
SELECT TEST PLAN.
PRESS # 4 KEY.
1. LOAD TEST PLAN
2. PRINT TEST PLAN
3. PRINT DIRECTORY
4
SELECT PRINT DIRECTORY.
PRESS # 3 KEY.
1.TIME BRKR
2.GET RSLT
3.SET UP
4.DIAGNOSTIC
Figure 24.0 Typical Test Plan Directory Print Out.