Hot tank installation – Waterstone UNDER SINK SYSTEMS 4500 User Manual

Page 4

Advertising
background image

Q

CABINET WALL

HOT TANK UNIT

(SIDE VIEW)

1.

12”

2.

3.

4.

V

R

S

U

T

Slide nut (R) onto
center Hot Tank tube
(S), threads up. Slide
on tapered collar (T).
Slide on 2 orange
O-rings (U). Position
stack of components on tube so that
O-rings are even with top tube. Hold nut
in place and thread connector body (V)
onto nut until snug.

Find a location under your sink that has access
to an electrical outlet and close enough to
reach faucet tube leads without kinking. For the
tank to operate properly, it cannot be installed
beyond the reach of the factory tubing.

Install hanging bracket (Q) to
cabinet wall. Make sure top
edge of bracket is at least 12”
from bottom of cabinet.

Mount tank on hanging
bracket as shown.

HOT TANK INSTALLATION

CHOOSE TANK LOCATION

INSTALL BRACKET

MOUNT TANK

CONNECTOR INSTALLATION

WARNING! DO NOT PLUG IN THE

HOT TANK UNTIL IT IS FILLED WITH

WATER. HEATING THE TANK WHILE

EMPTY WILL DAMAGE UNIT

Advertising
This manual is related to the following products: