2 installation checklist – IEI Integration NANO-9452 v4.01 User Manual

Page 83

Advertising
background image

NANO-9452 EPIC Motherboard

Page 65

Before and during the installation of the NANO-9452 DO NOT:

 Remove any of the stickers on the PCB board. These stickers are required for

warranty validation.

 Use the product before verifying all the cables and power connectors are

properly connected.

 Allow screws to come in contact with the PCB circuit, connector pins, or its

components.

5.2.2 Installation Checklist

The following checklist is provided to ensure the NANO-9452 is properly installed.

 All the items in the packing list are present

 The CPU is installed

 The CPU cooling kit is properly installed

 A compatible memory module is properly inserted into the slot

 The CF Type I or CF Type II card is properly installed into the CF socket

 The jumpers have been properly configured

 The NANO-9452 is inserted into a chassis with adequate ventilation

 The correct power supply is being used

 The following devices are properly connected

o

IDE device

o

SATA drives

o

Keyboard and mouse cable

o

Audio kit

o

Power supply

o

USB cable

o

Serial port cable

o

Parallel port cable

 The following external peripheral devices are properly connected to the

chassis:

o

VGA screen

o

Keyboard

o

Mouse

o

RS-232 serial communications device

Advertising