Qualcraft Aluminum Folding Multi-Function Scaffold User Manual
Page 2

Worksite Inspection
Users of FramePro Scaffolding must walk the area in which they will work, to remove any materials that may be a in the way of the
scaffold setup. Particular care must be taken to note floor hazards such as construction debris, holes in the floor, etc. FramePro
Scaffolds must be used on solid flat surfaces.
Equipment Inspection Prior to use
FramePro Scaffold users must thoroughly inspect the scaffold prior to use. All components must be complete, functioning properly
and correctly assembled. Any incomplete part, missing part, or ill-fitting part should be replaced prior to use. Never use a FramePro
Scaffold without first completely inspecting the unit.
During Use
Keep the platform free from trip hazards. Do not allow loose objects and debris to accumulate on the platform. Make sure the unit is
free from paint, mud, grease or any other hazardous material that may cause you to slip. Never leave the scaffolding unattended.
Following Use
When finished with scaffolding inspect for any damage, deterioration, and any missing parts.
Equipment Maintenance Platforms
Platforms must be checked for loose or missing edge banding, large holes or thin spots where the plywood has been worn. Worn or
damaged boards must be replaced with new boards.
Trusses and Guardrail Sides
Trusses and Guardrail sides must be checked to make sure locking pins are working correctly. Any bent pins or guardrails should not
be used.
Ladders
End Frame Ladders must be inspected for loose or missing caster bushings and stack pins. Casters should be lubricated and checked
before every use.
Casters
Casters should be checked for worn or damaged wheels, and missing bearings. Wheels should spin freely and bearing races should
turn freely and smoothly. Axle, bearing should be lubricated often.