Assembly of the outriggers warning, Assembly of a framepro scaffold tower, Caution – Qualcraft Aluminum Folding Multi-Function Scaffold User Manual

Page 7

Advertising
background image


2.)Rail will feel “loose” this is normal. Pull gently up to ensure proper locking.






Assembly of the Outriggers

WARNING

Before scaffold units are to be stacked, a set of (4) Outriggers (MFS-

NOR, MFS-WOR) with casters shall be installed on the base section
of scaffolding. (OSHA 1910.29) The casters must be the same size as

the casters in the base scaffold



.







1. Insert a caster into each 2. Attach one Outrigger (with caster) 3. Lock the casters on the
Outrigger. Casters used in to each of the four (4) ladder legs Outriggers each time
the Outriggers must be the of the base scaffold section. you lock the casters on
same size as the casters used Lock them into place by using the base scaffold. This
in the base scaffold.

(2) safety snap pins. is to be done prior to

the same size as the ca- to climbing the tower.
sters used in the base For easier locking and
scaffold. unlocking of the casters,
turn the brake lever outward.

Assembly of a FramePro Scaffold Tower

CAUTION


Do not erect a free-standing FramePro Scaffold Tower more than three

(3) Sections high. Use a team of at least two (2) persons to erect a

FramePro Scaffold Tower – one on the ground handing up components

and a second person on the tower installing the components.

1. Assemble a Basic FramePro Scaffold base by following

the instructions in this booklet
.

2. Install a set of four (4) outriggers on the base section if

3. you are planning on stacking the MFS more than its

single height. by following the instruction in this booklet.

4. Lock the casters on the scaffold and four (4) outriggers

Advertising