Qualcraft Stacker Bracket Frame User Manual

Page 11

Advertising
background image

G

ua

rd

ia

n

Fa

ll

Pr

ot

ec

tio

n

6

30

5

S.

2

31

st

S

t.

, K

en

t,

W

A

9

80

32

p

ho

ne

: (

80

0)

4

66

-6

38

5

f

ax

: (

80

0)

6

70

-7

89

2

w

w

w

.g

ua

rd

ia

nf

al

l.c

om

9

2. Nail selected 2” x 4”, 3’ Support Brace to Support Bracket at layout mark. DO NOT drive nail
flush, as it must be removed during disassembly. Support Bracket might not always be centered
on Support Brace. DO NOT nail Support Brace to wall.

3’ long, 2” x 4” Support Brace

MUST cross MINIMUM
3 wall studs

3. Attach Top Clamps to paired Support Brackets: 1) Ensure Top Clamp is sized correctly for
applicable installation location; 2) Turn Threaded Bolt Nut until snug to secure Threaded Bolt in
Top Clamp Housing (nut MUST NOT be installed on opposite side of Support Bracket); 3) Apply a
small amount of thread lubrication to Eyebolt; 4) Insert Top Clamp Peg and Threaded Bolt
through corresponding Support Bracket holes; 5) Use a socket wrench to tighten Threaded Bolt
until it is fully secured in Support Bracket. DO NOT insert Hitch Pin until after Eyebolt is tightened
onto rail (see: steps 7 and 8).

Hitch Pin

Threaded Bolt

Eyebolt

Top Clamp

Top Clamp Peg

Threaded Bolt
Sheathing

Threaded Bolt Nut

Advertising