9. Install all remaining Top Clamp and Support Bracket assemblies.

10. At sheer wall locations, a Lowering Strap should be secured to Support Bracket as shown.
Hang Lowering Strap over top of railing and secure. Lowering Strap is used during disassembly.

11. Install all Guardrail Posts from a secured ladder. Insert
Guardrail Posts into designated installation locations on
Support Brackets. Guardrail Post rungs must face in towards
the structure on which the Top Clamp and Support Bracket
assembly has been installed.

Rungs face in
towards rail

Guardrail Post
installation
location

12. ALWAYS install first set of Scaffold Planks and
Guardrails from a secured ladder. All Scaffold Planks
and lumber Guardrails MUST overlap a minimum
of 12” on EACH end. Overlapping Scaffold Planks
do not need to be secured with fasteners.

13. Install (2) 2” x 10”, 10’ long Scaffold Planks across two consecutive Top Clamp and Support
Bracket assemblies. Ensure Scaffold Planks fully span the two assemblies, and will overlap with
adjacent Scaffold Planks by a minimum of 12” on each end.

MINIMUM overlap over
adjacent Scaffold Planks: 12”

(2) 2” x 10”,
10’ Scaffold Planks