En g li sh, Ac b – Pfister VTP-E21W User Manual

Page 2

Advertising
background image

EN

G

LI

SH

ENGLISH

4

3

7

Thank you for purchasing this Price Pfister product. All Price Pfister products

are carefully engineered, and factory tested to provide long trouble-free use

under normal conditions. This product is easy to install using basic tools and

our easy to follow illustrated instructions.

3 TOOLS RECOMMENDED

• FTFE Plumber’s Tape

• Spatula

• Safety Goggles

• Sealant

• Slotted screwdriver

• Phillips Screwdriver

• Pliers

• Adjustable wrench

• Flashlight

• Cloth

Your installation may require other additional tools.

4 CONTENTS OF THE BOX

A Seat Cover

B Wax Ring

C Toilet Bowl

D Toilet Tank

E Toilet Lid

F Installation Kit: {Supply Valve, Flange, Hose, Rubber Gasket, [Tee Bolts (2), Nuts

(2), Washers (2), Plastic Washer (2), Decorative Cap (2)], [Brass Bolts (2), Wing Nuts

(2) Washers (4)]}

5 WORK AREA INSPECTION

Verify that the Waste Outlet Hole is 12” (305 mm) (5A) from the finished wall (5B).

1 BEFORE PROCEEDING

WARNING: This product comes complete for installation. Read all the instructions

completely before proceeding. Price Pfister recommends calling a professional if you

are uncertain about installing this product!

This product should be installed in accordance with all local and state plumbing and

building codes. This product is heavy and fragile; use extreme care with all parts!

2 SHUT OFF WATER SUPPLY

Locate main water supply inlets and shut off the water supply valves. These are usually

found near the water meter. If you are replacing an existing toilet, remove the old toilet

and wax ring from the floor and clean the floor surface thoroughly.

6 WATER SUPPLY VALVE INSTALLATION

A. Slide Flange (6A) through Water Supply Pipe (6B) until it is tight to the wall.

B. Remove Sleeve (6C) and Cover Nut (6D) from Supply Valve (6E).

C. Insert Supply Valve (6E) into Water Supply Pipe (6B) until the end of Pipe sits flush

inside Supply Valve (6E).

7 WASTE OUTLET HOLE PREPARATION

Place and align Tee Bolts (7A) into Flange Groves (7B) located on the Floor Flange

(7C) of Waste Outlet Hole as shown.

5

6

2

A

B

F

C

E

6A

6B

6E

6E

6D

6C

6B

5A

5B

7A

7A

7B

7C

A

C

B

D

Advertising