En g li sh, Ab c – Pfister VTP-E21W User Manual

Page 4

Advertising
background image

EN

G

LI

SH

ENGLISH

14

17

15

16

13 UNIT START UP

Turn on Main Water Supply Valve and check for leaks.

14 TANK LID INSTALLATION

Place Tank Lid (14A) on top of Tank (14B). Be sure Lid Lip (14C) covers the top of

Tank (14B).

15 FLUSHING

Press Flush Button (15A) to activate flushing mechanism. Flushing Button (15A)

comes with Full Flush (15B) and Reduced Flush (15C). Check for leaks above and

below the toilet.

16 SECURING TOILET BOWL

Secure Toilet Bowl (16A) to the floor surface by placing a bead of sealant around Toilet

Bowl Base (16B). (Sealant not included). Please follow manufacturer’s instructions

when using sealant.

4

14A

17B

17B

17J

17H

17H

17K

17M

17K

17L

17N

17H

17E

17A

17A

17D

17E

17F

17G

17C

17C

14B

14C

15A

15B

15C

A

B

C

16A

16B

Advertising