Yokogawa PR300 Power and Energy Meter User Manual

Page 12

Advertising
background image

<Toc> <Ind>

<2. Configuring the Power and Energy Meter>

2-3

2.3 Receiving the Setup Data or Creating New

Setup Data

The following three methods are available for starting to create setup data.

• Receive the setup data of the power and energy meter.
• Open a setup data file.
• Create new setup data.

Receiving the Setup Data of the Power and Energy Meter

Before carrying out the following procedure, check to see that the communication mode

and parameters are set correctly. For details, see Section 2.2, “Setting the

Communication Mode for Connecting to the Power and Energy Meter.”

1

. From the Communication menu, choose Receive Setting. You can also click the

Receive Setting icon on the toolbar. A confirmation dialog box for receiving settings

opens.

2

. Click OK.

The reception starts. When the reception of the settings is complete, a message

appears to indicate it.

3

. Click OK.

IM 77C01Y01-01E

Advertising