Maintenance, 1 calibration apparatus, 2 calibration procedure – Yokogawa JUXTA VJU7 User Manual

Page 8

Advertising
background image

8

All Rights Reserved. Copyright © 1999, Yokogawa M&C Corporation

IM 77J01U07-01E

4th Edition Feb. 09, 2007-00

12. MAINTENANCE

The product enters the operable status as soon as the power is turned on, but requires 10 to 15 minutes of warm-up to meet the
performance requirements.

12.1 Calibration Apparatus

Calibrator (Yokogawa Meters & Instruments’ CA71 or equivalent): 1

Temperature sensor (Yokogawa Meters & Instruments’ B9108WA or equivalent): 1

Digital Multimeter (Yokogawa’s 7561 or equivalent): 1

Precision resistor of 250

±

0.01%, 1 W: 1

Setting tool for adjustment (Refer to “8.2 Connecting the Setting Tools” in this manual.)

12.2 Calibration Procedure

(1) Connect the instruments as shown in Fig.12.1.

First adjust the output-1 signal and then the output-2 signal.

(2) Produce the input signal equivalent to 0, 25, 50, 75 and 100% of the input span from the calibrator. Check that the converter’s

output signals show voltages corresponding to 0, 25, 50, 75 and 100% within the rated accuracy range.
If the output signal is out of the rated accuracy range, adjust the output signal level using the VJ77 PC-based Parameters Set-
ting Tool or JHT200 Handy Terminal.
Refer to the user’s manual for VJ77 PC-based Parameters Setting Tool (IM 77J01J77-01E) or for JHT200 Handy Terminal (IM
JF81-02E).

10

11

3

2

1

4

5

6

7

8

9

3

1

4

+

A

B

B

Thermocouple Input

RTD Input

Calibrator

Calibrator

Calibrator

RJC

L+

N–

GND

Power Supply

9

7

Analog output

Output 1

3

1

+

mV Input

R

+

3

1

4

5

2

11

8

10

Analog output

Output 2

R

+

Temperature sensor
(B9108WA)

Digital

multimeter

Digital

multimeter

5

6

5

2

Alarm 2

Alarm 1

Calibrator

Calibrator

ALM2 (NO)

COM

ALM1 (NO)

COM

R: 250

precision resistor for

current output

R: 250

precision resistor for

current output

Fig. 12.1

Advertising