C. DRYER ENCLOSURE REQUIREMENTS
Bulkheads and partitions should be made from noncombustible materials. The clearance between the bulkhead
header and the dryer must be a minimum of 4-inches (10.16 cm) and must not extend more than 4-inches (10.16
cm) to the rear of the dryer front. The bulkhead facing must be made of a noncombustible material in ALL the
way to the top of the dryer.
NOTE: Bulkhead facing should not be installed until after dryer is in place. Ceiling area must be
located a minimum of 12-inches (30.48 cm) above the top of the dryer.
NOTE: When fire sprinkler systems are located above the dryers, a minimum of 18-inches (45.72 cm)
above the dryer console (module) is suggested.
IMPORTANT: Right side of dryer must be at least 24-inches (60.96 cm) from any obstruction to
allow for access to lint screen.