C. dryer enclosure requirements – American Dryer Corp. ADH-120 User Manual

Page 17

Advertising
background image

13

C. DRYER ENCLOSURE REQUIREMENTS

Bulkheads and partitions should be made from noncombustible materials. The clearance between the bulkhead
header and the dryer must be a minimum of 4-inches (10.16 cm) and must not extend more than 4-inches (10.16
cm) to the rear of the dryer front. The bulkhead facing must be made of a noncombustible material in ALL the
way to the top of the dryer.

NOTE: Bulkhead facing should not be installed until after dryer is in place. Ceiling area must be

located a minimum of 12-inches (30.48 cm) above the top of the dryer.

NOTE: When fire sprinkler systems are located above the dryers, a minimum of 18-inches (45.72 cm)

above the dryer console (module) is suggested.

IMPORTANT: Right side of dryer must be at least 24-inches (60.96 cm) from any obstruction to

allow for access to lint screen.

Advertising