Deep well application, Step 6, Step 8 – Burcam 503721 CONVERTIBLE C.I. JET PUMP 3/4HP 115/230V User Manual

Page 9: Step 2, Step 4, Step 5, Step 7

Advertising
background image

DEEP WELL APPLICATION

9

FOR INFORMATION TEL: 514.337.4415 FAX: 514.337.4029

STEP 3

Install 1" nipple

into 1" foot valve, then

screw in injector.

STEP 6

Install well seal

and piping into well casing.

STEP 8

Cut 1" and 1 ¼" poly

pipes and connect both ends.

STEP 2

Screw 1

¼" ven-

turi adaptor and 1" adaptor into

injector body.

STEP 4

Cut 1" and 1

¼"

poly pipes.

STEP 5

Insert well seal elbows

thru the seal and attach to pipe.

STEP 7

Install your pump and thread

adaptors into their respective opening.

Advertising