Deep well application, Step 6, Step 8 – Burcam 503721 CONVERTIBLE C.I. JET PUMP 3/4HP 115/230V User Manual
Page 9: Step 2, Step 4, Step 5, Step 7
Advertising
![background image](/manuals/361738/9/background.png)
DEEP WELL APPLICATION
9
FOR INFORMATION TEL: 514.337.4415 FAX: 514.337.4029
STEP 3
Install 1" nipple
into 1" foot valve, then
screw in injector.
STEP 6
Install well seal
and piping into well casing.
STEP 8
Cut 1" and 1 ¼" poly
pipes and connect both ends.
STEP 2
Screw 1
¼" ven-
turi adaptor and 1" adaptor into
injector body.
STEP 4
Cut 1" and 1
¼"
poly pipes.
STEP 5
Insert well seal elbows
thru the seal and attach to pipe.
STEP 7
Install your pump and thread
adaptors into their respective opening.
Advertising