Sewage pump application, Step 3, Step 2 – Burcam 400409T SEWAGE PUMP 2HP 230V User Manual

Page 5: Step 4, Step 5, Step 6, Step 7, Step 8, Step 9, Step 10

Advertising
background image

STEP 3

Cement 2” adaptor to
pipe

STEP 2

Install sewage basin

STEP 4

Drill a 1/4” hole

SEWAGE PUMP APPLICATION

STEP 5

Install discharge
pipe and lower
pump in centre of
basin

STEP 6

Set gaz tight
cover, discharge
and vent pipes

STEP 7

Install check
valve

STEP 8

Connect to receptacle

STEP 9

Fill with water and
test operation

STEP 10

Secure cover and
make vent connection

5

FOR INFORMATION TEL: 514.337.4415 FAX: 514.337.4029

Advertising
This manual is related to the following products: