Typical installation diagram for column pump – Burcam 300402 SUMP BUDDY SUBM. BACK UP MUNICIPAL WATER SUMP PUMP User Manual

Page 6

Advertising
background image

FOR INFORMATION TEL: 514.337.4415 FAX: 514.337.4029

6

TYPICAL INSTALLATION DIAGRAM

FOR COLUMN PUMP

2”

STEP 2
Remove electrical
power and verify for
check valve.

STEP 3
Install T or Y fitting
and link discharge
lines together.

STEP 4
Adjust in vertical
position and leave
2” under SUMP
BUDDY.

STEP 5
Run a supply line
with a ball valve
near pump area.

STEP 6
Flush line to
remove debris.

STEP 7
Screw automatic
control valve.

STEP 11
Install float and rod
to automatic valve.

STEP 12
Fix vacuum
breaker.

STEP 8
Install the float
bracket.

STEP 9
Assemble float rod.

STEP 10
Install float.

STEP 1
Install with solid
discharge line from
1 1/4” to 2” pipe
size.

STEP 13
Adjust length of
connecting hose.

STEP 14
Test manually
automatic control
valve operation.

STEP 15
Fill pit with water.
Verify automatic action
and starting level.

STEP 16
Turn on electrical
power of conventional
sump pump.

This ejector is
press fit fixed.
Do not try to
unscrew, you will
damage and void
warranty.
Please call us to
make maintenace
at 1-800 361-1820.

Advertising