Davey RAINBANK WALL MOUNTED CABINET SYSTEM User Manual
Page 13
Advertising

13
8. Cable tie the power lead from the pump to pipework and plug into base of RainBank
®
.
9. Open Mains water valve and check for leaks.
10. Switch on power to RainBank
®
and check for flashing green light – light will flash
ten times as it boots up.
11. Open a tap downstream of RainBank
®
to clear lines of air and check for leaks.
12. Press manual override button on top of RainBank
®
to start the pump and clear
air from rainwater lines. There must be rainwater inside the tank – this is an
important part of commissioning the system.
13. Close tap and check for leaks.
MAINS
WATER
SUPPLY
RAINWATER
SUPPLY
TO TOILETS
AND LAUNDRY
Power to pump via
3 pin socket
Incoming power to RainBank®
via 3 pin plug
Advertising