Concrete – Davey Hurricane Turbo Swim Jet User Manual

Page 3

Advertising
background image

3

CONCRETE

DRILLING:

Position the pattern on the inside casing taking
the 400 mm linear dimension between the axis
XY and the top of the structure into account.

CAUTION: Make sure you position axis XY
parallel to the top of the structure.

Pierce the 2 mounting bolt holes of 6 mm
diameter in A and B.

MOUNTING OF PACKAGE 1 ON THE JET BODY:
1. Placing of the self-adhesive Gasket:
Clean the pre-drilled side of the Counter Flange (2) then stick Gasket (4) to Counter Flange.

2. Mounting of the Jet Body:
Place the Counter Flange (2) at the rear of the Jet Body (1) and fix the whole device to the
inside casing by using the 2 fixation screws A and B.

Make sure the outer casing is fixed to the sleeves so that the concrete cannot enter. If this is not
the case, use a piece of polystyrene to fill the gap.

CAUTION: Fix the air intake pipe against the wall of the premises, above water level, by using
the hook provided for said purpose.

Advertising