Wing nut press-fit bolt, Cover cool pad pad support, Install cool pads and front covers – Hired-Hand Mega-Cool: Square Reservoir User Manual
Page 11: Side view

Part No. 4801-5397 Rev. 5-08
Mega-Cool System – Square Reservoir
Page 11
Install Cool Pads and Front
Covers
1.
Insert snap-on Pad Supports into the top of the
Reservoir.
2.
Insert pads into pad supports at bottom.
3.
Fit bolts through holes in back of support
brackets as shown above.
4.
Fit top of cool pad underneath spray line support
bracket and against back plate. Repeat for all
pads.
5.
Fit covers into the front slots of the spray line
support brackets. Insert top flange of cover into
slots of brackets as shown above.
6.
Tighten wing nuts to secure cover in place.
7.
Add cover splice to each joint where two covers
meet. See diagram above for cover splice.
Wing nut
Press-Fit
Bolt
Side View
Side View
Cover
Cool
Pad
Pad Support
Mega-Cool
Cover
5.141 in.
13.06 cm