Top view, Install spray line – Hired-Hand Mega-Cool: Square Reservoir User Manual
Page 9

Part No. 4801-5397 Rev. 5-08
Mega-Cool System – Square Reservoir
Page 9
1
2
3
Install Spray Line
1. Glue spray line sections together. Important! Glue joints with
spray line holes pointed in the same direction. Allow glue to
dry. The spray line must have a tee joint in the middle. Be
sure to point tee section at 90° to holes in line. Refer to the
Center-Mount System Diagram on Page 15. Spray line tee
installation will be simplified if the spray line is cut after the
In-Line Pump & supply line is plumbed and the correct tee
placement verified.
2. Insert spray line assembly into one end of top bracket. Slide
assembly until spray line spans entire length of top bracket.
3. Rotate spray line to place holes facing upward. (NOTE: Side
View shown at left).
Rotate spray line
To point holes
upward.
Assemble Spray
i
Lay Spray Line Into Top Support Brackets
Spray Line Installed With Holes Upward
TOP VIEW
TOP VIEW
Be sure to point holes in the same
direction when gluing Spray line.
Be sure to point tee section at 90°
to holes in line.