Enable CheckPoint™ for a Power Source

Chapter 2. Preparing for CheckPoint™

IM8000 CheckPoint™

User

Manual

2.7

Figure 2.1 Connecting to the Welding Power Source

NOTE |

Remember that the IP address displayed is either the last

Welding Power Source to which Power Wave® Manager
connected or that you recently updated with the Update
Utility.

Procedure

Details

1.

Select

Start > Programs > Lincoln Electric >

Power Wave® Utilities from the computer’s
main program menu.

2.

Select

Power Wave® Manager to launch

the utility.

The Power Wave® Manager window opens and
defaults to the Connect screen. See Figure 2.1.

3.

Choose

the

Connect through Ethernet option

and enter the IP address of the Welding
Power Source.

For more details or information on finding the IP
address of the Welding Power Source, please refer
to the Power Wave® Manager User Manual.

4.

Click

the

Connect button.

The system establishes the connection and
automatically displays the Registration page of
Power Wave® Manager so you can enable
CheckPoint™ (Figure 2.2 on page 2.8). Please
continue to Enabling CheckPoint™ on page 2.8.