Operation, Welder operation, Auxiliary power operation – Lincoln Electric IM722 Demo Zone K1854-2 and K1854-3 User Manual

Page 14

Advertising
background image

B-3

OPERATION

B-3

WELDER OPERATION

DUTY CYCLE

Full output and duty cycle may not be obtained from
all power sources. The output and duty cycle may be
limited by the 40 amp input power limitation of the
Demo Zone. The duty cycle of the power source must
be adjusted to be within the capability of the 40 amp
input supply.

Duty cycle is based upon a ten minute period. A 10%
duty cycle represents 1 minute of welding and 9 min-
utes of idling in a ten minute period.

Some examples of allowable duty cycles of the Demo
Zone are given. If the duty cycle or input currents
exceed the capability of the 40 amp circuit breaker,
the breaker will trip off. For lower output currents, the
duty cycle is extended from what is listed.

V350-PRO

200A at 28v

100% duty cycle

41A input

275A at 31V

10% duty cycle

62A input

Power MIG 255 (machine limited)

200A at 28v

60% duty cycle

37A input

250A at 30v

40% duty cycle

46A input

Pro Cut 55

55A

15% duty cycle

55A input

Square Wave TIG 175

150A

10% duty cycle

65A input

AUXILIARY POWER OPERATION

Duty cycle and maximum current may be less than
rated value if the power sources are powered from the
Ranger 250 or ZR-10.
(Refer to Ranger 250/ZR-10 Operator’s Manual).

DEMO ZONE

Advertising