Forward, Receiving and installation – Wellsaw 1016 User Manual

Page 2

Advertising
background image

1

FORWARD

The Model 1016 Wellsaw has been designed and manufactured to conform to Wellsaw's
recognized high standards of quality and performance. Each saw must pass a series of
final inspection tests, including actual metal cutting operations, before it is shipped. For this saw
to provide satisfactory service, it is necessary that it be properly installed, operated and
maintained. This manual has been prepared to assist you in carrying out these functions. We
urge you to study this manual and follow its suggestions.

RECEIVING AND INSTALLATION

Un-crating

Carefully remove the protective crating and skid so the saw and its parts are not marred or
otherwise damaged. In the event of damage in transit, notify the carrier and file a Proof of Loss
Claim immediately.

Shortages

Inspect the complete shipment carefully against the itemized packing list. Make sure that all
items are present and in good condition. In the event of any shortage, notify the distributor from
whom you purchased the saw and the carrier who made final delivery.

Utility Hook-Up

The use of a qualified electrician is always recommended when connecting the saw to the main
power supply. Electrical codes differ from area to area and it is the customer’s responsibility to
ensure that their saw complies with applicable codes. Your Wellsaw is pre-wired at the factory
for a specified voltage. Always check the motor and electrical panel to ensure that they are both
wired to correspond to your electrical power supply.

Parts Ordering

For your convenience:

When contacting your Wellsaw Supplier or the Company for parts or service,

it is essential that you have your Model, Serial Number and Purchase Date

available. Jot them down here for handy reference.

Model: 1016

Serial Number:________________

Purchase Date:________________