Section 2 - installation, 1 unpacking and inspection, 2 terminations and controls – KEPCO ABC-DM SERIES User Manual
Page 25: Figure 2-1. abc series front panel, Figure 2-2. abc series rear panel, Unpacking and inspection -1, Terminations and controls -1, Abc series front panel -1, Abc series rear panel -1
Advertising

ABC 040104
2-1
SECTION 2 - INSTALLATION
2.1
UNPACKING AND INSPECTION
This instrument has been thoroughly inspected and tested prior to packing and is ready for
operation. After careful unpacking, inspect for shipping damage before attempting to operate.
Perform the preliminary operational check as outlined in PAR. 2.5. If any indication of damage is
found, file an immediate claim with the responsible transport service.
2.2
TERMINATIONS AND CONTROLS
a) Front Panel: Refer to Figure 2-1 and Table 3-1.
b) Rear Panel: Refer to Figure 2-2 and Table 2-1.
FIGURE 2-1. ABC SERIES FRONT PANEL
FIGURE 2-2. ABC SERIES REAR PANEL
Advertising