4 mounting, 1 general instructions, 2 mounting information – KROHNE SU 600 EN User Manual
Page 11

4 Mounting
4.1 General instructions
You can mount theSU 600 signal conditioning instru-
ment onto a carrier rail 35x7.5 acc. to DIN EN 50022, or
directly on the wall by means of the three screws or in a
front panel or door of a switching cabinet.
4.2 Mounting information
1 Place the adapter plate [1] to the rear of SU 600
(spring of the adapter plate downward) and fasten
the plate with screw [2] (M4x6).
2 PlaceSU 600 against the carrier rail [3] from below
and push the instrument upward until it snaps in.
61
43,5
2
1
3
Fig. 2: Carrier rail mounting
1 Adapter plate
2 Screw (M4x6)
3 Carrier rail
1 Insert the metal strap [1] from above into the housing
cut-out.
2 Fasten the instrument directly to the wall with the
three screws (ø max. 4 mm).
Installation location
Carrier rail mounting
Wall mounting
SU 600 - 4 … 20 mA signal conditioning
11
Mounting
30652
-EN
-050525