Service – KROHNE DK 46 I-DK 47 I EN User Manual

Page 20

Advertising
background image

5

SERVICE

20

DK46I - DK47I

www.krohne.com

08/2008 • 4000360001 MA DK46I-47I-R01-en

Changing the measuring cone

•

Close valve upstream and downstream of the device.

•

Close needle valve.

•

Push protective cover upwards and remove to front.

•

Turn the lock nut in the device base

1

anti-clockwise.

Devices with a top and bottom fitting made of PVDF (DK.../PV) have a tensioning screw in the
device head(Allen key 6mm).
This can be unlocked with approx. 1 full turn.

The measuring glass can be removed to the front.

•

Install in the reverse order:

•

Fix the measuring glass in position by tightening the lock

nut finger-tight in the device base

1

first of all.

•

Use a 3mm pin to tighten the lock nut with 4x ... max. 5x

4x ... max. 5x

4x ... max. 5x

4x ... max. 5x 120° turns clockwise.

2

Before restarting the flowmeter, check leak-tightness by
suitable means.

Figure 5-1:

Mainenance

CAUTION!
Residual liquid or gas may leak out!

CAUTION!
To avoid glass breakage, the measuring glass must be
inserted concentrically between the gaskets.

MA_DK46I_47I_R01_en_PRT.book Page 20 Tuesday, August 5, 2008 7:03 AM

Advertising