3 replacement of the signal converter, 4 field assembly – KROHNE BM 70 A_P EN User Manual

Page 30

Advertising
background image

Installation and operating instructions BM 70 A/P

Page: 30

11/00

7.3 Replacement of the signal converter

Always disconnect from power source before commencing work!

Hazardous-duty systems

Before replacing the signal converter (instrument "head") in the hazardous location, make absolutely
certain that there is no explosion hazard (gas-free certificate). Allow the prescribed waiting time of 22
minutes to elapse before opening the housing!

1. Remove safety lock (see Sect. 9.3) with machinist's wrench, size 4 mm, and unscrew cover from

the terminal box with the special wrench. If a sunshade is fitted, remove this first (see Section
6.1.9).

2. Disconnect all cables from the terminals in the terminal compartment, see Section 7.8.

3. Remove the 4 Allen screws M (Allen key size 5 mm) and lift off the signal converter. The flange

unit (incl. waveguide window) will remain tight, also on pressurized tanks.

Caution

On pressurized tanks, do not on any account remove the 4 screws H connecting the waveguide
window to the BM 70 A/P flange! DANGER TO LIFE!

4. Install the new BM 70 A/P signal converter.

5. Check power voltage and fuse(s) (refer to instrument nameplate) and change or replace if neces-

sary, see Sect. 9.2 and 9.3.

6. Reconnect all cables in the terminal compartment as described in Sect. 7.8.

7. Check against the attached report on settings whether the factory-set parameters are correct for

your application. If not, reset the parameters as described in Sect. 8.

8. Subsequently, record the empty-tank spectrum, see Sect. 8.6.12.

Important:
Ensure that the screw thread of the covers on the terminal and electronic compartments is well
greased at all times.

7.4 Field assembly

•

When the BM 70 A/P needs to be field assembled, all

required parts are included with the supply (stud bolts,
washers, etc.).

•

If supplied loose, bolt the waveguide window (flange

assembly) or the distance piece to the BM 70 A/P.
Tightening torque for the 4 Allen screws M (key size SW 5
mm): max. 8 Nm ~ 0,8 kpm.

•

Note: The upper Teflon plug must be absolutely dry and

clean! Moisture and dirt will negatively affect functionability
of the BM 70 A/P!

•

Bolt antenna and antenna extension together: torque for the

3 stud bolts: max. 8 Nm ~ 0.8 kpm.

•

Do not on any account detach screws H!

distance piece (for

high-temperature version
up to 250°C (482 °F)

upper Teflon plug

O-ring

lower Teflon plug

O-ring

BM70 A
connecting flange

antenna extension

antenna

M

H

M

signal converter

Advertising