MAINTENANCE

This section is limited to information pertaining to the general maintenance of Badger

Meter Recordall Turbo Series meters

An exploded view of the meter, along with part numbers and descriptions, are provided in the Recordall Turbo Series Meters

Parts List

Maintenance Equipment

The tools and equipment recommended for use in servicing and maintaining of Recordall Turbo Series meters consist of the

usual complement of hand tools used by plumbers and mechanics

Preventive Maintenance

The purpose of preventive maintenance is to ensure efficient operation and long life of the meter by detecting and correcting

any defect that might damage the meter or cause it to fail Preventive maintenance consists of periodic inspection, accuracy

testing, and cleaning procedures

Periodic Inspection

• Visually inspect the meter for missing hardware, loose screws, broken or scratched register lenses or any other signs of

wear or deterioration

• Verify that the meter is operating at the proper flow rate and pressure A loss in pressure, coupled with a decrease in flow

rate, may indicate that the screen in the upstream pipeline—or the meter itself—is clogged with foreign material and

needs cleaning

Cleaning

• Clean all dirt, grease, moisture or other foreign material from the exterior of the meter After cleaning, rinse thoroughly

with water

• In the event that system pressure has been reduced and the upstream filter or meter is clogged, the foreign material

must be flushed out To flush the screen, open the cleanout plug and purge the foreign material with fresh water from the

service line If cleaning the screen does not restore system pressure, the Turbo meter also should be flushed by purging

with fresh service water through the cleanout plugs located on the housing

• Integral Strainer Units: Before attempting service/maintenance of strainer section, system pressure must be removed After

system pressure is removed, remove cover bolts and cover Clean out/flush strainer section of all loose particles/debris

After cleaning is complete, reinstall screen and reassemble Return meter to normal service

Shutdown Instructions

If the turbo meter is to be shut down for an extended period of time or if it is being removed from service, Badger Meter

recommends that the meter and measuring components be thoroughly flushed to prevent the settling out of undissolved

solids or the accumulation of corrosive deposits If there is an upstream strainer in the line, it also should be flushed at

this time