Operational Startup

The following steps should be followed when installing and starting the meter

MAKE SURE THAT FLUID FLOW HAS BEEN SHUT OFF AND PRESSURE IN THE LINE RELEASED BEFORE ATTEMPTING TO

INSTALL THE METER IN AN EXISTING SYSTEM.
1 After meter installation, close the isolation valves and open the bypass valve Flow liquid through the bypass valve for

sufficient time to eliminate any air or gas in the flow line

2 Open upstream isolating valve slowly to eliminate hydraulic shock while charging the meter with the liquid Open the

valve to full open

HIGH VELOCITY AIR OR GAS MAY DAMAGE THE INTERNAL COMPONENTS OF THE METER.
3 Open downstream isolating valve to permit meter to operate
4 Close the bypass valve to a full closed position
5 Adjust the downstream valve to provide the required flow rate through the meter

OTEE:

N

The downstream valve may be used as a control valve

DIMENSIONS/DRAWINGS

A

B

C

Stnd. #28-04 Auth. #956

Figure 8: Dimensions

Part No.

A

B

C – Ferrule Size

B16C-0XXA-XXX

3 00 in (76 2 mm)

1 46 in (37 1 mm)

0 984 in (25 0 mm)

B16C-1XXA-XXX

4 00 in (101 6 mm)

2 00 in (50 8 mm)

1 984 in (50 4 mm)

B16C-1XXA-XXX ¹

6 25 in (158 8 mm)

2 33 in (59 2 mm)

1 984 in (50 4 mm)

B16C-2XXA-XXX

6 50 in (165 1 mm)

3 20 in (81 3 mm)

3 047 in (77 4 mm)

¹

15 0…180 0 gpm flow range only

Table 4: Dimensions