Tee Test

Install tee between the pump and control valve . Connect the tee to the IN port of the PFM tester . The OUT port of the tester is

connected to the tank . Pumps and relief valves can be isolated from the system and checked with the Tee Test .

TANK

OPEN LOAD VALVE BEFORE

STARTING MACHINERY.

INDICATES DISPLAY

OVER RANGE.

DO NOT STAND IN FRONT OF

PRESSURE RELIEF DISK VENT.

Flo-check

PFM

by HEDLAND

RACINE, WI. USA

FLOW

TEMP

O

FF

CONTROL

VALVE

TEE

PUMP

RELIEF

VALVE

OUT

Flo-check

PFM

OUT

IN

Figure 7: Tee test

INCREASE PRESSURE SLOWLY. THE RELIEF VALVE MAY NOW BE ISOLATED FROM THE HYDRAULIC CIRCUIT, AND SYSTEM

PRESSURES HIGHER THAN THE RELIEF VALVE SETTING CAN RESULT IN INJURY TO PERSONNEL AND/OR DAMAGE TO

THE EQUIPMENT.
1 . Pump Test

a . Plug the line to the control valve .
b . Open the tester loading valve fully to read maximum pump flow at zero pressure .
c . Close the loading valve to increase pressure from zero pressure to rated or maximum pump pressure to determine

pump condition .

d . Check the pump flow at rated pressure against the pump manufacturer’s specifications . A decrease in flow from

zero pressure to maximum pressure indicates the pump condition . A pump that delivers a constant low flow at zero

pressure and at maximum pressure suggests suction problems .

2 . Relief Valve Test (for relief valve in separate housing, see

“Relief Valve in Separate Housing” on page 12

.)

a . Put a control valve into a power output mode with the output flow blocked, such as a cylinder at the end of its stroke .
b . Close the tester loading valve while viewing the pressure . Pressure will increase until the relief valve opens . Record the

pressure at this point . Repeat to check the relief valve adjustment .

Test procedures