Pipe orientation and sensor mounting – Badger Meter AS - Steam (2 to 72")" User Manual

Page 4

Advertising
background image

PIPE ORIENTATION AND SENSOR MOUNTING

Preferred installation

Allowable plane of installation

Field Weld

FLOW

Figure 2: Horizontal pipe installation

F

L

OW

F

L

OW

OR

Field W

eld

F

L

OW

F

L

OW

OR

OTEE:

N

Preferred flow direction for steam is upward .

Illustration represents installation for upward flow .

Figure 3: Vertical pipe installation

OTEE:

N

For general steam applications, instrument valves should be mounted at the same elevation to maintain equal

condensation levels .

Ellipse® Pitot Tube Meter, AS Annular Threaded Steam Meter

Page 4

April 2014

Advertising