Processing of mounting surface – Dwyer UXF3 User Manual

Page 94

Advertising
background image

-86-

5.4. Processing of mounting surface

Using thinner and sand-paper, remove the pitches, rust and uneven surface of the detector mounting piping over the entire
mounting area of (L) + 200mm wide. (Fig. 5-3)
Note) When the piping exterior is wrapped with jute, remove the jute and then perform the above treatment.

Jute winding

Pipe

Fig. 5-3

Bulletin F-107-UXF3

L + 200mm (7.87in)

Advertising