Frequencies.

Utility frequency, bypass frequency and output frequency in Hertz (Hz).

Load and batteries.

Load: Percentage of the load in relation to the total UPS capacity.
Bat Voltage: shows either the positive or negative half of the battery voltage (the lower value of the
two will appear).
Bat Cap: Percentage charge on the batteries in relation to the total battery capacity.
Runtime: The predicted runtime at the current load.

Batteries.

Bat AmpHr: Battery capacity, including both external and internal batteries.
UPS Temp: The highest external battery temperature.

Alarm thresholds.

Load: An alarm will be set when the load is above the threshold level.
Runtime: An alarm will be set when the runtime is below the threshold level.

Clock set-up

From the Setup screen on the Main Menu, you can change the date and the clock setting. From the
Settings screen, select Clock, and press ENTER. A date and a time line will appear.

Time.

The clock function is used to time-stamp events in the event log. To avoid inaccuracies, change the
clock-setting at e.g. daylight-saving time.

Date

• To change the date, press ENTER (the day field will become active). Press the UP/DOWN

arrow to select the desired date.

• To change the month and the year, follow the same procedures.

• Press ENTER to confirm the new settings, or ESC to cancel.