Front panel installation – American Power Conversion 200/208 V User Manual
Page 29
Advertising
Operation – Front Panel and Battery Compartment Cover Removal/
990-2359A
Smart-UPS® VT 10-30kVA, 200/208V and XR Battery Enclosure Operation Guide
21
Front Panel installation
Insert the two protrusions at the bottom of the Front Panel into the two slots at the bottom of the
Enclosure.
Push the Front Panel into place.
To secure the Front Panel, turn the screw counterclockwise to locked position.
Advertising