Battery compartment cover installation – American Power Conversion 200/208 V User Manual

Page 28

Advertising
background image

Operation – Front Panel and Battery Compartment Cover Removal/Installation

20

Smart-UPS® VT 10-30kVA, 200/208V and XR Battery Enclosure Operation Guide

990-2359A

Battery Compartment Cover installation

Place protrusions in slots at the bottom of the UPS.

Place top protrusions in slots where shown.

Attach with M6 screws to inner side panels in both sides.

Advertising