Sterlco SPV Remote Proportioning Devices User Manual

Page 11

Advertising
background image

Remote Proportioning Valve

Chapter 3: Installation

11 of 28

Floor-Mount Installation

Use the following procedure to install the SPV using the floor stand: (See Figure 2 for more
information.)

1. Assemble the stand by inserting the standard into the floor plate and tightening the

set screw.

2. Complete the assembly by following steps 3 through 6 on page 9.

3. Position the floor stand so the clean-out and inspection hatches are accessible and the

material hoses do not interfere with workspace or create a tripping hazard.

Figure 2: Floor-Mount Configuration

Advertising